Just Another Monday at Arcola
With temperatures in the mid 90s, it was a busy Monday. We got all the greens aerified and dryjected, fairways were starting to be aerified, we moved 12,000 sq ft of fairway sod on 18, we killed off 2 acres of rough to convert to fescue and we have been working on fairway bunkering on 18 as we rebuild the hole. While the weather has been difficult of late, the course remains in good condition and we continue to make good progress on rerouting the 18th hole. Kudos to my staff.
Saturday, August 8, 2015
New 18th Tee Complex Progressing
With 3 truckloads of sod already laid and the berm planted by the storage building, we are nearing completion of the tee complex. Monday we will be sodding the tee tops, then doing some detail work around the tees and we have about 5 pallets of rough sod left to lay out and we can just about call this part of the renovation finished. With the extreme dry weather and lack of rain, this is not the ideal time to lay sod but it is good for getting work completed. This coming week we are getting in fill needed to create the mounding and bunkering out in the fairway landing area. The week of August 17th, we have our sod contractor coming in to relocate the fairway sod to match the new fairway lines.
Saturday, August 1, 2015
Battling Through The Dry Weather
With the hot and dry weather of late, construction has been a challenge with dust and dirt so dry that it is hard to shape and finish. This week we have at least 2 truckloads of sod coming along with 15 spruce trees that will be planted to hide our cold storage building. Lets hope for some much needed rain before then.
18th Tees Progressing
This is the view of the new 18th hole alignment behind the 15th green. In a matter of less than 2 weeks, we got all the trees removed, hauled dirt in to build 5 tees, installed the majority of the irrigation and constructed a new cart path, all while battling through a heat wave.
Wednesday, July 29, 2015
Get Ready For the Heat
Sun setting on another hot day. Next 5 days will be extremely hot and dry. We will not be raising mowing heights as of yet, but we will be cutting back on double and triple cutting and rolling to get us through the next week or so.
Rerouting the 18th Hole
We started breaking ground on a new 18th tee complex that will now make the hole a dogleg to the right instead of a straightaway hole. The hole will play 450 from the black, 425 from the blue and 385 from the whites. It will be a much more demanding tee shot. By relocating the tees, we can now push our driving range tees back to 315 yards from end to end when we rebuild the range this fall.
Building A New 10th Tee
With the clubhouse renovation going on and the addition of the building, we needed to raise the grade behind the new piece about 6 feet to get grades to meet. We basically had to rebuild the 10th tee and have it done in 3 days for the Invitational. We sodded it on Tuesday and had members playing on it on Friday.