The new 6" water line is being installed from the pump house to the 17th green. This will feed the water feature that is by the 17th green and run through the ditches on 12,16 and 17. This pipe is being run 2500 feet and we are hoping to have it up and running in another 7-10 days.
No comments:
Post a Comment