Amazingly, this is the first CapCon install since before Thanksgiving! Between saturated conditions and cold temperatures, we had ideal conditions to pour one day in almost 100 days. We figured we would be 90% done with bunkers by now.Bunker shaping, edging and draining is moving along at a rapid pace. We only need to finish shaping 3,5,6 and 7 and all bunkers will be shaped and ready for CapCon and sod. We need temperatures to stay above 35 and limited rainfall to keep progress moving.Who remembers what the new tee on 1 looked like 2 months ago. A massive pile of dirt that has now transformed into a natural landform that is housing our new first tees. Most of the hillside has been sodded to fine fescue. From most vantage points it will look like a natural landform instead of a massive tee complex.