Saturday, August 29, 2026

Nursery Progress

 


What a difference a week makes.  As long as we can keep our poa plugs moist we can push them along.  This is 7 days after spreading and rolling.  The next 3-4 weeks will now include topdressing, fertilizing and rolling.  We will decide in another 7 days if we need to apply a small amount of bentgrass seed to help fill in voids.

Friday, August 28, 2026

One Improvement at a Time

 

With some work done around 14 green complex, water flow patterns were changed, creating drainage issues we did not have before.

The staff banged out some drainage on Wednesday morning ahead of the next rain event.  


A much needed improvement.  There are several of these new areas around the course that we will address each week.  Right now with the weather it is hard enough just trying to keep up mowing grass and getting aeration to recover.

Saturday, August 22, 2026

Back to the Drawing Board


 
After the recent heavy rains, this area "popped up" in the left rough of 17.  We noticed some thinning last week and then today the area was saturated with standing water.  Once we dug up the area, we found an active drain that was cut and continued to bleed out onto the surface.  We removed the old section and actually drained the entire area and tied into a drain we installed within the last 5 years.  Unfortunately, the saturated conditions will create a rehab of this area with leveling and sodding.  The only positive is that we can still see sodded main lines and laterals that makes digging much easier.  These little issues will continue to arise after each significant rainfall unfortunately.

Thursday, August 20, 2026

Building New Turf Nurseries


 With the collection of green cores, we will now build a nursery for greens.  This will be key in the future for repairs or expansions.  We are also building a nursery on the side of the range for fairways and tees with the cores we collected from both.  During the renovation we pillaged all our nurseries and had no source finishing up the summer.  We will be in a good spot in 2027.

Final Steps

 






With the sudden addition of heavy rains this afternoon, it was all hands on deck to blow off, sweep and get the remaining fairways topdressed and brushed before the 2pm rain arrival.  Crew absolutely crushed it in 4 days.  Only have some plugs left in the rough to sweep and remove.

Tees Thrown In the Mix




 

Another long day of pulling cores and shoveling off tees.  

No Rest For the Weary


 
While the crew was working on greens, we had another crew starting on fairways.  This is more simple with pulling cores, dragging, sweeping, topdressing and brushing.  Of course Monday was not a great beginning but the weather turned in our favor.

All In A Days Work


 Step 1 is to core aerate all the greens on the course.


Step 2 is to bury greens in sand and then solid tine on top.


Step 3 is to deep tine all greens except the new greens.  

This entire process started at 5:30am and finished at 5:30pm.  We used approximately 100 tons of sand on the greens.

Saturday, August 15, 2026

The Rehab Begins

 Like most renovations and irrigation system installs, growing pains will follow.  Drains get cut, veins in the soil get opened or closed etc.  Now that we have endured drought and extreme rainfall, we are identifying areas that need attention.  Each week we try to pick off an easy fix.

The area between 15 and 16 is suddenly wet and thin.  Our staff went in and installed some drainage and resodded using sod from our old par 3 tee surrounds.  Little expense, huge improvement.



Babying Fairway Expansions

 

The fairway contouring started in the summer of 2025 when we scalped down future fairway lines.  Here is the old 1st hole, which is now our 9th hole.  We basically scalped it from 3" to 1" in one mow, then got it down to 1/2" within 2 weeks.  Over the next 6 months, we sprayed out the rough grasses, leaving only some bent and poa.  We also seeded in some bentgrass to help fill in voids.


Fast forward to August 2026 and it is starting to look like a fairway, but the poa is under extreme stress right now after enduring 5 heat waves, drought and now a lot of rain.  Most likely some bacterial wilt going in on there as well.  The funny part is LaBar had to remove a rock from the fairway and sodded with bentgrass.  Look at how well the bent is and the poa is struggling.  This expansion will be fine by summer of 2027 and it takes a good 18 months for the grasses to get acclimated to being managed differently.

Growing Pains

 

On the left side of 5 fairway where some contouring was done, we noticed a bare spot.  Upon opening the sod, we saw it was a rock.  We figured lets go get a shovel and dig it out.


2 hours later with an excavator we were able to finally get it out.  The funny thing is irrigation went around it as you can see in the top picture where the head is located and how the pipe coming across the fairway turns around it.  These are all the imperfections we will continue to find over the next 6-12 months.

Sunday, August 9, 2026

Watch What You Wish For!


 For April, May and June our staff worked extremely hard to keep new sod and seed alive, with high temps, low humidity and almost no rainfall.  I remember hoping for a few downpours to help us keep new grass alive and help germinate the out of play fescue seed.


The rains came and havent let up for almost 3 weeks.  Creating playability issues and hampering maintenance.

Once the humidity kicked, grass has been growing like a weed, leaving clippings everywhere.  Regardless of growth regulators and frequent mowings, once the natural rainfall releases all the nutrients in the soil you are fighting it until the humidity and rainfall subside.

When it Rains it Pours!


 As if torrential rains of late havent been challenging, this large Tulip fell in the pond on 14.  A big machine will be needed to pull it out of the pond once they are able to cut it up.  With limited access this will be a challenge to get this removed without making a complete mess!


This is not the lake on 7 but it is the puddle in front of the range tee.  When we built the range back in 2016, we identified this problem and added drainage.  With the renovation, the drain pipe was cut and not repaired and we are back to square one.  The contractor will have to dig in the berm you see in the backdrop to connect the pipe back to where it drains to.

After a significant rain, we noticed the bunker on 3 was full of water.  How can that be, it is brand new with new drainage.  The outflow pipe under the fairway was inadvertently cut by the irrigation crew and not repaired.  After some digging, we found the issue and resolved it.  

While a golf course renovation and irrigation system replacement projects are stressful enough and once the contractor has left the course, we all assume everything is going to be great.  It took extreme heat and drought this summer to identify irrigation shortcomings and now heavy rains in July and August to find drainage issues.  It will be a good 12 months until we feel we have everything under control.