Wednesday, September 28, 2022

Finally

 


We purchased this brush this past spring and planned on using it to tighten up our fairways throughout the season.  With the hot and dry weather we had not been able to use it until now.  You can see how much it stands up the bentgrass and after mowing it returns it to the tight surface it was before.  We did get a decent amount of grass the first time doing this and will possibly do it one more time before winter depending on weather and turf conditions.  This will be a great tool to work topdressing into the canopies this November as well on fairways and approaches.

Friday, September 16, 2022

Time For Some Wear and Tear

 

The putting course was built for enjoyment and for an emergency turf nursery.  We spread the plugs from our greens when we built it and seeded a little bentgrass in as a nurse grass to help it along.  2 years later and the majority of the area is bentgrass with little poa.  This will not be a viable option at this time to sod a green or do a green expansion until we can get more poa into it.  Best way to do this is introduce wear and treat it like all our poa greens.  We will start rolling this or a portion of it when we roll greens, apply more sand and water and make more frequent growth regulator and fungicide sprays.  By allowing this to wilt and for pests to take over, probably removed most of the poa.  

Irrigation Showing Its Age

 

Lucky for us this pipe broke right at 6:15 while the fairways were still running and Andrew was able to spot it in time.  Had this happened in the middle of the night it would have been a complete mess today.  Victor was able to get it fixed pretty quick and the fairway will be operational by the end of today.  

Friday, August 5, 2022

Ready for Divots!

 

We know having 156 of the best amateurs in the world each day using our range, the tee is going to get beat up for 4+ days.  We have been thinking of the best way to clean up the tee each evening to allow us to get it done more efficiently and it looks like we will repurpose our turf sweeper to help with this chore.  If all goes as planned, we can now get the range cleaned with probably half the men and half the time.  This will allow us to use men to help do other important tasks during evening preps.

Wednesday, July 27, 2022

Changing it Up

 

Normally we would be venting with our deep tine aerifiers right now, but with the dry weather, upcoming heat and the US Am only 3 weeks away, we decided to use the hydroject.  This machines injects water to make a small hole to allow the greens to breathe.  Once done, we will blow off any excess sand and you would not know we did the greens.  If we were to make the normal 5/16" hole, we would be chasing wilt during the day as the greens would dry out too fast.  You have to be flexible with your programs based on weather conditions, time of year and events.  A deep tine vent would be done in about 4.5 hours with 2 machines and this will take 8-12 hours with 2 machines.

Friday, June 17, 2022

The Truth About Venting

 





This morning we vented greens, which normally gets done on Monday mornings.  With our busy outing schedules and early outing shotguns, Mondays are not an option until we get to August and September.  With the Arcola Cup on July 8, the US Am Preview on the 12th and a Member Guest on the 14th, it is now or wait another month.  The pictures above show the process, a tractor punches pencil sized holes in the greens and it is followed by a roller to smooth the surface.  For good measure, we did a stimpmeter reading following the practice and we rolled 15'.4".  No impact on speed, trueness or smoothness.  The only thing now is the the greens will dry down much quicker over the next few days but it is a good trade off after the heavy rains of late. 

Monday, June 6, 2022

Final Preparations Underway for Invitational

 

Venting was done last week, this week we are doing a little verticut on greens before the Invitational on Thursday.  This will help thin the surface a bit to allow for firmer conditions and smoother greens.  The forecast now looks like heavy rain Wednesday night, so looks like more bunker work on the horizon.  Was hoping to get a break from the rain for a week to provide the best possible conditions for the event.  Staff will somehow getting everything back together before Thursday afternoon.