Tuesday, October 9, 2012

Ditch Maintenance This Week

The main ditches on 12 and 16 are being cleaned out this week and a stone base is being installed  at the same time.  Over time, the ditches get overgrown which leads to water traveling slower through them, which in turns slows up drainage on the course.  Also, our well water travels through 12 and 16 to get to our irrigation pond and the vegetation was significantly slowing its flow.  This will be much easier to maintain in the future, plus the water is much more visible now.

No comments:

Post a Comment