Monday, June 4, 2018

Lawn Area Nearing Completion

The bulk of the heavy lifting is done.  The black tee above the rock wall is done but we cannot finish our tie ins until the stair case is installed.  A few smaller rocks are needed on the wall to tie into the steps as well.   Some minor sodding is left to do along with 2 sets of blue stone staircases which will require a lot of plywood and careful work not to disturb all the finished work.
The good news is the sod was laid on Thursday and the area has been mowed twice already and topdressed and sprayed. 